Unit Refurbishments
Demolition works:
- Floor coverings ie carpet, ceramic tiles etc.
- Walls/plasterboard bulkheads.
- Bathrooms/ensuite.
- Plumbing.
- Electrical.
- Door hazards.
Re-install:
- Painting throughout.
- New power point and light switch covers.
- New joinery items or reface existing.
- New kitchen or reface with new doors, gables etc, glass splashbacks.
- Floor finishes.
- New work to bathroom/ensuite, frameless showerscreens, vanities, fixtures and fittings.
- Re-brassing of existing fixtures and fittings if required.
